Property
1924 Historic Retrofit (Inglewood)
Panel Optimization: furnished and installed a new quad 20/20 breaker, removing existing breakers to create the necessary space for high-draw circuits without a full panel upgrade.
Dedicated Circuitry: installed a new 50-amp breaker specifically for the EV charging station to handle the consistent thermal load required for rapid home charging.
Modernizing a home built in 1924 requires a careful balance of upgrading capacity while working within the constraints of older infrastructure. Our client in Inglewood needed a high-speed Level 2 charging solution for their electric vehicle, which required a new 50-amp circuit and a significant conduit run from the main panel to the desired charging location.
1924 Historic Retrofit (Inglewood)
50A Dedicated Circuit via Quad-Breaker Optimization
60ft Custom Conduit Run (3/4″ with #6 AWG lines)
By utilizing strategic conduit routing and panel optimization, we delivered a modern, high-speed charging solution while 100% preserving the integrity of the home’s original 1920s infrastructure.